1200% INCREASED PRODUCTIVITY
Traditionally building baffle boxes and installing them on site is likely to take circa 2 hours. QuickFix Profiles Baffle Boxes can be installed within 10mins.
RAPID INSTALL/REDUCED LABOUR/PROGRAMME TIME
Baffle boxes are mostly required in Party walls where the Kitchens meet back-to-back. In these locations you are likely to require circa 5No Baffle boxes behind each socket location. Traditionally, you would therefore require an operative for 10hrs to install 5No baffle boxes to one face of this wall before the wall can be closed. Using QuickFix Profiles Baffle boxes the same operation would take less than 1hr. Offering a saving of 9hrs for your operative or saving your business / programme 1No working day from this one requirement to one flat.. How many flats does your project have?
QUALITY ASSURED CONSTRUCTION
QuickFix Profiles use a machine cutting process for our board works, which is “mm” perfect and offers smooth finished edges. Our production team are fully versed on building QuickFix Baffle boxes with staggered & sealed plasterboard joints.
100% REDUCTION IN WASTE MANAGEMENT COSTS
QuickFix Profiles Baffle Boxes arrive at site fully built and ready to be installed. QuickFix Profiles return our plasterboard waste to the manufacturer to better our “circular Economy” impact on the environment.
HEALTH & SAFETY
Not only do QuickFix Profiles Baffle Boxes offer an improved Health & Safety standard toward the dust reduction, but by using QuickFix Profiles Baffle Boxes you eliminate the potential risk of knicks and cuts from using Stanley blades or skil saws when building Baffle Boxes on site.